Hello,
I'm going to have my converters removed and replaced with custom downtubes and was wondering if I should have them weld in all 4 o2 bungs or should I just have 2 or 1 put in ??
I'm goiong tio have this done once the weather breaks and I'll be getting a custom tune sometime soon afterward so I don't know if I need to have any of the 4 sensors after the tune or should I just have 1 bung welded in for tuning purposes.
I've got all the bolt-ons plus ported PI heads, VT cams and custom dual exhaust from the converters back. I just need to know what I should have before I get the work done.
Thanks,
Jon
I'm going to have my converters removed and replaced with custom downtubes and was wondering if I should have them weld in all 4 o2 bungs or should I just have 2 or 1 put in ??
I'm goiong tio have this done once the weather breaks and I'll be getting a custom tune sometime soon afterward so I don't know if I need to have any of the 4 sensors after the tune or should I just have 1 bung welded in for tuning purposes.
I've got all the bolt-ons plus ported PI heads, VT cams and custom dual exhaust from the converters back. I just need to know what I should have before I get the work done.
Thanks,
Jon